Description
Product Description:
- Our Premium range black or white high speed HDMI cables are a very high build quality HDMI cable with Foil Shileding, Shielded pair and drain wire. They are also a little thicker than most HDMI cables you will see for sale on eBay with the longer lengths thicker still to ensure signal integrity even at distances up to 20 metres. They also feature gold flashed contacts that provide a higher quality finish and anti-corrosive properties.
-
Other sellers use our photographs and put our barcodes on their listings – but they are not the same quality cables!
-
High quality HDMI Cable. This cable is suitable for 3D and 4K Ultra HD TVs but also backward compatible so perfect for almost any application inclusing XBOX, PS3 PS4 and Sky etc etc
HDMI (High Definition Multimedia Interface) is a specification that combines video and audio into a single digital interface for use with DVD players, digital television (DTV) players, set-top boxes, and other audio visual devices. HDMI supports standard, enhanced, or high-definition video plus standard to multi-channel surround-sound audio.
-
High Speed With Ethernet
-
HDMI resolutions inc 720p, 720i, 1080i, 1080p, 2k x 4k
-
4K x 2K Resolution Support at 60 hertz
-
Audio Return Channel
-
Connections: HDMI Standard Type A Male – HDMI Standard Type A Male
-
Compliant with HDMI versions 2.0, 1.4 and v1.3
-
Colours Available: Black or White
-
Lengths Available: 0.5m, 1m, 1.8m, 2m, 3m, 5m 7m, 10m, 15m, 20m
-
Fully HDCP compliant to provide highest level of signal quality.
-
Compatible with all devices using 18 or 19pin HDMI ports: HDTV, Sony PS3 / PS4, XBox / XBOX
-
ONE, Sky HD box, HD-DVD recorders/players, Blu-ray Other Set Top Boxes, Video Monitors,
-
Projectors, LCD and PLASMA TV’s etc
-
Wire Gauge @ 0.5 to 5mtr – 30awg
-
Wire Gauge @ 10 & 15mtr – 28awg
-
Wire Gauge @ 20mtr – 24/28awg
Box Content:
- 1 X HDMI Cable High Speed
Reviews
There are no reviews yet.